Skip to content

Courses

Learning streak: 6 days in a row

Video · 9 min · Lesson 6 of 7

From pilot to production

Why pilots stall, and how a six-week time box keeps momentum.

Transcript

Many agent pilots never ship. The reasons repeat: scope grows with every demo, nobody defined what good enough means, the pilot runs on a laptop without authentication, logging or monitoring, and no one with authority owns the rollout.

A time-boxed approach helps. Spend the first week on discovery: architecture on one page, a risk register, a cost estimate and success metrics. Build on production infrastructure from the first day, behind a feature flag, so nothing needs rewriting at the end.

Roll out gradually, for example to five, then twenty-five, then one hundred percent of cases, while watching the logs and the approval rate at each checkpoint. Hand over with documentation and a monitoring runbook, so the team can run the agent without its builders in the room.

Key takeaways

  1. Pilots stall on scope creep, unclear success criteria and missing production basics.
  2. Build on production infrastructure from day one.
  3. Roll out gradually and hand over with documentation and monitoring.